.

Overview

SSP At A Glance

History

Corporate Mission

Quality Service

Quality Policy

Registration

Awards

Engineering Services
Publication
Home

:: Publication

                                
  1. A Basement Excavation Using Tie Back, Internal Horizontal Strutting And Inclined-Struts-And-Berm System
  1. A Case History Of A Coastal Land Reclamation Project
  1. A Software For Graphical Presentation Of Subsoil Profiles
  1. Case Histories Of Using Reinforced Soil Wall For Slope Remedial Works
  1. Characteristics Of Ground Movements In Deep Excavation With Concrete Diaphragm Walls In Bangkok Soils And Their Prediction
  1. Challenges To The Design Of Motorway Ingress/Egress To SMART
  1. Collapse Of A Reinforced Soil Segment Retaining Wall
  1. Collapse Of A Sheet Pile Monsoon Drain
  1. Deformation Behaviour Of A Retaining Wall For A Deep Basement Excavation With Semi-Top Down Method
  1. Design, Installation & Performance Of Jack-in-Pipe Anchorage System For Temporary Retaining    
  1. Discussion on Compression Of Peat
  1. Dynamic And Static Load Tests On Large Diameter Bored Piles
  1. Earth Retaining Systems For The Shaft Excavation Of SMART Tunnel
  1. Evaluating Undrained Shear Strength Of Klang Clay From Cone Penetration Test
  1. Experience Of Using Dynamic Compaction In Landfill Areas
  1. Failures Due To Excavation In Soft Clay
  1. Failure Of A Soil Nailed Slope
  1. Geotechnical Aspects Of SMART Tunnel
  1. Geotechnical Design Of A Hilly Road
  1. Jacking Of 2.4m Diameter Drainage Pipe Culverts Under An Expressway Embankment
  1. KLIA'S New A380 Hangar
  1. On Karstic Features Of Kuala Lumpur Limestone
  1. Performance Of Jet-Vibro Sheet Piles And Soldier Piles Temporary Retaining System
  1. Secondary Compression Of Peat With Or Without Surcharging
  1. Slope Stability Analysis
  1. Some Case Histories Of Slope Remedial Works
  1. Some Construction Experiences On Soft Soil Using Light Weight Materials
  1. Some Engineering Properties Of Soft Clay From Klang Area
  1. Stabilization Of A Failed Slope With Reinforced Soil Wall
  1. Stormwater Management And Road Tunnel (SMART) Project Flood Detection System (FDS)
  1. Stormwater Management And Operation (SMART) Project
  1. Stormwater Management And Operation (SMART) Design Challenges To Cut-And-Cover Tunnels
  1. Stormwater Management And Road Tunnel (SMART) - A Submission For The ACEM Engineering Awards 2008
  1. The Stabilisation Of Slides That Caused The Collapse Of A Pylon
  1. The Use Of High Capacity Hydraulic Injection Piles For Buildings In Limestone Ex-tin Mining Sites In KL
  1. Treatment Of Landfill Using Dynamic Compaction Technique
  1. Use Of Expanded Polystyrene (EPS) Blocks For The Repair Of Differential Settlement Problem At A Bus Terminal
  1. Use Of Prefabricated Vertical Drains To Expedite The Consolidation Settlement
  1. KLIA New A380 Hangar
 
 

 

© Copyright 2006 All rights reserved. For comments & questions please send e-mail sspsb@sspsb.com.my