| Work
Experience
|
::
Geotechnical
& Foundation
|
- Site
Investigation
- Failure
Investigation
- Forensic
Engineering
- Ground
Improvement
- Slope
Engineering
- Foundation
Design
- Basement
& Retaining Walls
- Underpinning
of Foundation
- Instrumentation
& Monitoring
- Geotechnical
Risk Assessment
- Expert
Opinion Arbitration
|
|
Major Job Experience |
 |
Berjaya
City, Kuala Lumpur |
| |
|
 |
West
Port (Phase II), Pulau Lumut, Klang |
| |
 |
Sentul
Raya Development, Kuala Lumpur |
 |
Terminal
Building Complex, Kuala Lumpur International Airport, Sepang |
| |
 |
A
Distressed Slope After Repair at Cheras, Selangor |
 |
Review
of Slope at Bukit Tandang, Shah Alam Expressway, Selangor |
 |
KL
Convention Center - Diaphragm Wall, 9m Excavation |
 |
Southern
Bank - CBP Wall, 14 ~ 17m Excavation |
 |
SMART
Project - Secant Piles Wall |
 |
SMART
Project - Rock Excavation, ~27m |
Brief
Description For Some Major Projects |
|
Buildings / Deep Basements |
>
A 14m
deep foundation excavation, Damansara
Height, Kuala Lumpur |
>
Deep Basement Excavation - Kuala Lumpur |
>
Deep Basement - Top Down Method |
>
Deep excavation, Kuala Lumpur Convention Centre and Hotel Tower |
> The SMART Tunnel and Kuala Lumpur Limestone |
| |
|
Land Reclamations |
>
Land
Reclamation, Jelutong, Pulau Pinang |
> Pond Reclamation for mixed development, Sungai Besi, Kuala
Lumpur |
| |
|
Investigations & Remedies |
>
Remedial work for a failed rataining wall in Setapak, Kuala Lumpur |
>
Remedial work for collapsed of Monsoon Drain,
Lebuhraya Damansara-Puchong
|
>
Rock Slope-Quarry-Cheras-Rawang |
>
Slope remedial works-Cheras |
>
Remedial work for a slope failure at Damansara Heights, Kuala Lumpur |
| |
|
Hillside/Slope |
>
Hilly Road - KKB - Frasier Hill |
>
Cassion Foundation - Genting Highlands |
|
|
|
|
|
|